Triton were initially contracted by Aker Solutions, then later by E-PC to design all of the floating structures, the strongback structures, all the internal support stools, for the various high load components for example the Surge Bin, various Sumps, Pipe Towers, Pump Stools, Pipe Bases, etc, on the KENMARE WCP-B Plant.
Select the images to explore further into each project

The 21 pontoons. along with all of these additional support structures were fabricated by SA Shipyards in Durban, to be transported on barges to Moma, where they are being assembled, along with the actual plant above.

WCP_B dredger called DEIDRE, originally designed and built in the USA and assembled on site. Triton has been involved on numerous projects to deal with cracking and freeboard issues.